From:                              route@monster.com

Sent:                               Tuesday, December 01, 2015 2:34 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Primavera P6

 

This resume has been forwarded to you at the request of Monster User xapeix01

neha saxena 

Last updated:  04/01/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Bloomington, IL  61704
US

Mobile: 309-660191   
saxena.neha30@gmail.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Neha_resume

Resume Value: m4f2xb9ryzvfgwyw   

  

 

              Resume

NAME:      Neha Saxena

 

CURRENT GRADE: Project Management Analyst/Planner/Scheduler

 

Experience Summary

·         Over three years of experience in Project coordination & Project Planning/Scheduling.

·         Over five & half years of experience in Verification of ASIC using Verilog, System Verilog and Specman.

·         Graduated with Masters in Project Management in August 2011 from Illinois State University.

·         Certified PMP Professional and Certified Scrum.

·         Strong understanding and knowledge in areas of Project Management.

·         Strong understanding and knowledge of software development lifecycle.

·         Experience working and coordinating with project team and management.

·         Experience in setting up projects using Primavera and/ or MS Project.

Technical Expertise

Elements

Particulars

Primary Skills

Planning/Scheduling/Project Management

Operating Systems

Sun Solaris, Unix, Windows 98/XP/VISTA

Languages

C, ASP.NET, C#,  PERL, VHDL, Verilog, Specman

Development Tools

Primavera, MS project

CRM tools

N/A

Middleware

N/A

Scripts

N/A

Database Connectivity

 

Databases

 

Configuration Tools

 

Domain Knowledge

 

ERP

 

Legacy Systems

 

Networking

AMBA AHB, AXI, Ethernet

Testing Tools

 

Documentation

 

Configuration Management

 

Client / Server Technologies

 

Foreign Language known

English

Experience Details (Starting from the Current Employer)

Sl. No.

Name Of The Organization

Designation

Joining Date

Relieving Date

1

NTT data Inc.

Consultant

12/13/2010

Right now with this company

2

HCL Technologies

Member Technical Staff

6/1/2005

12/31/2009

 

 

 

 

 

 

 

 

 

 

 

Project Details

NTT Data Inc.

 

Project Name

 

Client

State Farm Insurance

Project Description

Unified Communications

 

Environment

 

Duration

From (mm/yy)

12/13/2010

To (mm/yy)

Still with the company

Role / Responsibility

·         Project Coordinator/Release Planner/Project Planner

Contributions

·         Develop comprehensive Deployment Schedules/Plans for Zones Deployment. Coordinated with multiple Stakeholders/streams to maintain the schedules and report the Status to Leadership.

 

·         Provide resource assignments and monitor milestones within metrics such as earned value and burn rate

 

·         Defining the vision, objective, and goals for projects working closely with Project Managers and deadline.

·         

·         Examines individual project plans and works with Project Managers to identify opportunities to reduce time, labor, and other costs as well as to improve quality control and operating efficiency.

 

·         Coordinate the resolution of issues/risks involving multiple stakeholders. Make sure the right players are assembled to resolve the outstanding risks/isssues.

         

·         Scheduled and facilitated multiple planning sessions with the project teams to build comprehensive project schedules that included all phases of project methodologies.       

 

 

·         Produced reports to keep management apprised of project status, major issues, scope changes, resource changes, milestone achievements or misses, and budget constraint

·        

·          Deploying new technology and managing technology zones end to end.

 

Team Size

30

 

HCL Technologies Ltd

 

Project Name

 

Client

Hewlett Packard

Project Description

1.     Project: Developing OVC Verification Component –OVM compliant (OVC)

 

Aim is to develop an OVC in Specman E, which is used at interface level between any block or system level environment and DUT to generate and drive single bit or vectored input signals for DUT. It also performs low level monitoring of the interface signals. It is completely OVM compliant.

 

2.     Project: Block Level Verification of networking node chip

 

Aim is to verify all the features for a strategic block of a node chip, enhancement of environment for new features and verifying them for next version of node chip .Improving coverage and monitor regressions.

 

3.     Project: Chip Level verification for networking Fabric chip

 

The fabric chip is designed to be used with the node chips to be used in networking applications.  Aim was to verify each component of the chip individually and also to carry out chip level verification in E language.   

 

4.     Project: AXI and AHB Verification IP in System verilog

 

The AMBAAXI protocol is targeted at high-performance, high-frequency system designs .Our aim was to develop the AXI and AHB verification IP in System Verilog .System verilog enhances the readability, reusability and productivity of verilog based code. It has support for both directed and constrained development test bench development, coverage driven and assertion driven verification. It involves less effort and randomization can capture scenarios which cannot be captured by verilog based Verification.

 

After reading the Basic specifications for AXI and AHB protocols an elaborated test plan was made to check basic operations which can be performed at the bus interfaces.

Followed by this an environment was developed in System verilog  consisting of basic elements like generator ,driver, scoreboard and monitor .Test cases were written where scenario elements were randomized and fired to check the protocol .Few test cases needed to be written which can check various scenarios.

 

The AXI verification environment was used to verify an RTL for shwy bridge .Constraints were written according to the need of the design .The environment successfully captured a bug which was not earlier captured by verilog based verification.

 

5.     Project: NAND FLASH CONTROLLER

 

6.     Project: USB 2.0 host verification IP in System verilog

 

 

 

 

Environment

Specman E/Verilog

Duration

From (mm/yy)

6/05

To (mm/yy)

12/31

Role / Responsibility

Project Coordinator/Project lead

Contributions

·         Assists work teams with understanding and utilizing the Work Management Processes (planning, controlling, executing, and closing.) This includes the process's:

·         Purpose

·         Use

·         Deliverables

·         Examples

·         Relationship to Project Methodology.

 

·         Subject matter consultant on planning processes;

·         Supported delivering the work on-time and within budget while meeting the goals by:

·         Defined procedures for the collection of team status and analysis of project's progress, including any metrics reporting and resource forecasting.

·         Analyzed the updated schedule, emphasizing items such as Critical Path, Slipped Tasks, and Upcoming Tasks.

·         Calculated, analyzing and presented metric reports, such as EVA and Burn Rate Analysis, to appropriate parties.

·         Managed resource assignments, monitoring current allocations and planning future needs.

·         Meeting with the Work Manager to discuss status.;

·         Analyzed status information;

·         Familiarize the team with the customer needs, specifications, design targets, the development process, design standards, techniques and tools to support task performance;

·         Assured that the team addresses all relevant issues within the specifications and various standards;

·         Worked with functional managers to obtain necessary resources to support the team's requirements;

·         Updated the work schedule with periodic status updates collected from the team;

·         Served as a focal point to communicate and resolve interface and integration issues with other teams;

·         Escalated issues which cannot be resolved by the team.

·         Identified test cases and developed test plans;

·         Development of verification environment in System Verilog;

·         Executed the test cases;

·         Identified bugs and opened and maintained the defects;

·         Developed User guide for the environment usage;

 

Team Size

20

Training Attended / Certifications Done

Course Details

Duration

 

From (mm/yy)

To (mm/yy)

1     Certified Scrum Master (CSM)

6/12/2011

6/14/2013

2     Project Management Professional (PMP)

4/27/2012

4/26/2015

3

 

 

4

 

 

Qualification Details (Highest Degree on Top)

Sl. No.

Degree

Branch

Year of Passing

Name of the College / Institute

Name of the University

Percentage / cgpa / Grade

1

Master In Science

Project Management

2011

Illinois State University

Illinois State University

A

2

Master of Technology

Very Large Scale Integration (VLSI)

2007

Banathali Vidyapith

Banathali Vidyapith

First Division

3

Bachelor of Engineering

Electronics & Communication

2005

Arya Institute of Technology

Rajasthan University

80%

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Project mangement

NTT data

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

Other

 

 

Target Job:

Target Job Title:

Project management

Desired Status:

Full-Time
Per Diem

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-IL-Bloomington/Peoria